About the Client
In July 2010, funding was allocated by Defence Reserve to support an Urgent Operational Requirement (UOR) for a Counter Improvised Explosive Device Information Management and Information Exploitation (C-IED IM/IX) training solution.
The project was established to support pre-deployment training for British Armed Forces personnel deploying on Operation HERRICK.
Akhter Computers was responsible for the design, procurement, configuration and deployment of comprehensive IT infrastructure across multiple defence locations in the UK and Germany, within an exceptionally demanding 12-week project timeframe.
.webp)
The Ministry of Defence required a reliable and scalable IT training environment capable of supporting specialist military training applications across both fixed and transportable installations.
The solution needed to accommodate different operating environments whilst meeting demanding performance, security and mobility requirements.
The key project requirements included:
Akhter developed two distinct IT infrastructure solutions tailored to the operational requirements of fixed training facilities and transportable training environments.
Akhter designed and implemented high-performance IT networks for four fixed Train the Trainer facilities across defence establishments in the UK and Germany. The infrastructure incorporated enterprise-grade HP servers and virtualised environments to support the complex and demanding applications required for military training.
Akhter designed and delivered 32 transportable local area networks, combining mobility, resilience and high-performance computing capabilities. The systems incorporated ruggedised hardware where required, alongside virtualised server infrastructure and security measures appropriate to their intended operating environments.
Working in close collaboration with the Command and Control Battle Lab (C2BL), Akhter supported the integration and configuration of specialist server applications. The infrastructure was designed to provide the processing performance, reliability and functionality required to support the training programme.
Consultancy and System Design
Akhter's system architects developed tailored IT infrastructure solutions to meet the differing performance, security and environmental requirements of fixed and transportable installations.
Project Management
Akhter managed all aspects of the project, including procurement, quality assurance, configuration management, application hosting, installation, training and technical support.
Installation and Deployment
Hardware and associated system images were prepared and tested prior to deployment. Network connectivity, equipment configuration and asset documentation formed an integral part of the installation process.
Technical Support and Training
Akhter's security-cleared project personnel provided technical expertise, introductory training and appropriate support services to military and civilian personnel involved in the training programme.
Akhter successfully designed, procured, configured, delivered and installed 36 local area networks within the required 12-week timeframe.
The initial installations were delivered by 27 August 2010, enabling the first training events for 3 Commando to take place during the first week of September. At the Combined Arms Tactical Trainer (CATT) facility in Germany, equipment was delivered one week ahead of the requested delivery date.
The project demonstrated Akhter's ability to deliver complex, large-scale defence IT solutions within demanding operational timescales, combining technical expertise, effective project management and comprehensive service delivery.
“The Akhter staff were all security cleared and worked well with our team, their knowledge and understanding of the MoD and ‘how to react to a call of IT help’ was, I am pleased to say, professional.”
“I would have no hesitation in recommending this organisation for working together in the future.”
BAE Systems – Contractor Logistic Support

Akhter equipped 21 classrooms at CIS School Bovington with 86-inch and 98-inch Silicon View interactive touchscreens, enhancing military training through advanced AV technology.
.webp)
Akhter installed a 263-inch LED video wall at MoD Southwick Park, enhancing defence experimentation and wargaming through advanced visual display technology and AV integration
.webp)
Akhter deployed a campus-wide digital signage solution at Worthy Down, improving communication and delivering real-time content across multiple displays.