Akhter Computers undertook a comprehensive IT infrastructure modernisation and migration project for the Ministry of Defence in Gibraltar, transitioning the existing GibLan network to the new ASH Forest environment.

The existing infrastructure consisted of numerous legacy servers, approximately 500 workstations and a range of business-critical applications that had become increasingly difficult to operate and support within the MoD network.

The project focused on replacing ageing infrastructure, improving system manageability and ensuring continuity of services throughout the migration of an operational military base.

Wide coastal view of the Rock of Gibraltar rising above the city skyline, with bright blue sea in the foreground, a sandy shoreline, and a few small boats on the water under a clear sky.

Requirement

The Ministry of Defence required a comprehensive migration solution to modernise its existing IT infrastructure and introduce an environment that could be efficiently maintained both locally and remotely.

The key project requirements included:

  • Replacement of ageing servers and the majority of existing workstations.
  • Migration of legacy infrastructure to the new ASH Forest environment.
  • Active Directory, data and email messaging migration.
  • Introduction of updated operating systems and business applications.
  • Testing and commissioning of the new network infrastructure.
  • Minimising operational downtime throughout the migration.
  • Technical training, user training and comprehensive project documentation.

Solution

Akhter developed a structured migration strategy in collaboration with the MoD System Design Authority, combining detailed planning, specialist migration tools and experienced technical personnel.

Infrastructure Modernisation

Akhter's project scope included the build, testing and commissioning of a new server farm, alongside the preparation and deployment of new workstations. Standardised system images were incorporated where required to support consistent deployment and future system maintenance.

Active Directory and Data Migration

Working closely with Quest and the MoD System Design Authority, Akhter utilised specialist Quest migration tools to support the transition from the existing GibLan infrastructure to the new ASH Forest environment.

The migration scope included:

  • Legacy server data migration.
  • Active Directory and domain integration.
  • Microsoft Exchange 5.5 to Exchange 2003 migration.
  • Integration of new workstations into the ASH Forest domain.
  • Network testing and commissioning.

Operational Continuity

A detailed discovery and auditing process was undertaken before implementation to identify potential challenges and develop appropriate solutions. The migration strategy was designed to minimise disruption to users, with the majority of the work required to take place in real time to maintain operational continuity.

Akhter Professional Services

Consultancy and Technical Planning
‍
Akhter conducted a detailed audit of the existing infrastructure, identifying potential migration challenges and developing a comprehensive implementation strategy.
‍
‍Project Management
‍
Akhter coordinated with the MoD System Design Authority, technology partners and on-site personnel, maintaining project documentation and ensuring changes to the migration strategy were reviewed and approved before implementation.

Installation and Migration
‍
Specialist engineers supported the build, testing and commissioning of server infrastructure, workstation deployment, Active Directory integration and data and messaging migration.
‍
Technical Support and Training
‍
Akhter provided technical expertise and escalation support throughout the migration, with IT support training, user training and project documentation forming part of the project scope.

Result

Through detailed discovery, strategic planning and specialist technical expertise, Akhter successfully supported the migration of the GibLan network to the ASH Forest environment.

The project addressed the challenges associated with ageing IT infrastructure, establishing a foundation for improved system maintainability and future technical support.

The project demonstrated Akhter's capabilities in managing complex defence IT infrastructure migrations where operational continuity, technical accuracy and effective stakeholder coordination are essential.

Download PDF version

More case studies

Instructor using a large Silicon View interactive touchscreen at the British Army’s CIS School, displaying a military vehicle in a snowy training environment.

CIS School Bovington  

Akhter equipped 21 classrooms at CIS School Bovington with 86-inch and 98-inch Silicon View interactive touchscreens, enhancing military training through advanced AV technology.

view case study
Exterior of the Defence Experimentation and Wargaming Hub (DEWH) at MoD Southwick Park, Portsmouth, featuring the building and an inset close-up of its official signage.

DEWH MoD Southwick Park

Akhter installed a 263-inch LED video wall at MoD Southwick Park, enhancing defence experimentation and wargaming through advanced visual display technology and AV integration

view case study
Modern multi-story white building with large windows and columns under a partly cloudy sky.

Worthy Down

Akhter deployed a campus-wide digital signage solution at Worthy Down, improving communication and delivering real-time content across multiple displays.

view case study